Installation, Testing, commissioning& Energization Substations
400/132/11 KV GIS equipment AL-Ameen SS 2002 – 2004
132/33KV GIS equipment AL-Washash SS 2005
132/33/11KV GIS South Sulamanya SS 2005
132/33/11 KV GIS Um Qasar SS 2006
400/132/33/11 KV GIS equipment AL-Rasheed SS 2006 – 2007
132/33 KV GIS Al Baker SS 2010
72/20 KV GIS equipment Damasus gate (Syria) SS 2011
132/11 KV GIS Al Rusafa SS 2012
132/33 KV GIS Nasiriyah SS 2013
132/33 KV GIS New Bab Al Zubair SS 2013
132/33 KV GIS Al Acadimiya SS 2014
400/132/11 KV GIS South Al-Nasiriyah SS Diameter 1 2020
132/33 KV GIS Al-Matar SS 2020
132/33 KV GIS Al-Mahad SS 2020
132/33 KV Qalat Salih GIS SS 2020
132/33 KV GIS Al-Massab Al-aam SS 2021
400/132/11 KV GIS South Al-Nasiriyah SS Diameter 2 2022
132/33 KV GIS Qurna west 2 oil filed Well-paid 4 2023
132/33 KV GIS Qurna west 2 oil filed Well-paid 9 2023
33/11/0.4 KV GIS ss Al-Zubair oil Filed 2024
33/11/0.4 KV GIS ss Al-Rafidiyah oil Filed 2024
Rehabilitation of Substations equipment
Project SS 174 (Gammas, Altahrer, Aleskandriya, Baled, Sumria, Dura, New Mishraq) 2005 – 2007
Project NT 15 (New Wazeria, Hilla North,Muqdadya) 2009 – 2010
Project NT 18 (Abo flus, Alhussainiya, New Hammam) 2009 – 2011
Project NT 16 (Al Tabadel Al Tijiry, Basrah West,Khanqeen) 2010 – 2011
Project NT 38 (Amara north, Hilla East, Nijaf West) 2010 – 2011
Project NT 24 (Kirkok East, Al Tameem,Hilla West ) 2010 – 2011
Project NT 26(New Fao, AliZfraniya, Abodisheer, Mosul East, Kerbala East) 2010 – 2012
Project NT 83 (Baladrose, Baweza, Ramady South, Tikrit East) 2011 – 2012
Project STX (Substation North Refineries) 2013
Qurna West 2 – 132/33 KV SS 2013
Checking and adjusting the relay settings of BNGL (Manpower) 2025
3.3/0.4 (AlDawra Oil Refinery) Manpower 2025
(Zuber one) Manpower 2025
Installation 33kV, 11kV,0.4 (Baiji Oil Refinery) 2025
Installation 0.4/6.6 transformer ( Artawi Al-Rumaila Al-Shamaliyah) 2026
Installation 33kV, 11kV,6.6/0.4 (IGC) 2026
Installation 132/33KV Transformer (MOE Daquq Station) 2026
Installation 132/33KV Transformer (Artawi Al-Rumaila Al-Shamaliyah ) 2026
Maintenance of the Power transformer
Maintenance of power transformers for generators No, 2,5,9,11 –Mullabed allah Power Generation Plant 2012 – 2014
Maintenance of power transformers for generators (Aqra Water Project) 2019
Assembling 33/11KV Power transformer at Grraf oil field 2022
Maintenance of Water plant generation station
Water plant generation station /Mosul Dam 2007 – 2008
High voltage test
Project SS 174 (Dura, New Mishraq GIS SS) 2008
Project NT 15 (New Wazirea GIS SS) 2010
Project NT 18 (New Hummam GIS SS) 2010
Project NT 16 (Basrah West GIS SS) 2011
Project NT 26 (New Fao GIS SS) 2011
Project NT 1(Rusafa GIS SS) 2012
Project NT 117 (Al Acadimiya , New Bab Al Zubair GIS) 2014
Damascus (Gate 8) 72 KV GIS SS /Syria 2011
Al-Masab AlAlaam 132/33KV GIS 2020
South Nasiriyah 400/132KV 2022
Rumaila North Oil filed 132KV cables 2023
BNJL H.V VLF Test 2026